NDT Inspection Plug

Installation Instructions


NDT Inspection Plug



NEW! PVC & Detectable Construction Tapes

  • Locate and mark the insulation jacket where the test is required.

  • Use either tin snips or a hole saw to penetrate the insulation jacket with a circumference equal to the size of the NDT Inspection Plug to be installed.

  • Remove the final layer of insulation in the safest and most convenient manner, using your hand or a knife, to expose the substrate for electronic and/or visual inspection.

  • After inspection, re-insert the insulation or replace with a high density material.

  • Insert the Sleeve. Note: Caulking around the sleeve for cold applications is recommended.

  • Install the Locking Ring and Lanyard (if applicable).

  • Insert the Metal Plug Cap to create a seal.